A new small shop was built in the last year but on the other side of the school area from the small shop already existing. It proves the increasing life around the school.
Moreover, as it was stated by the locals last year, a channel for water, is under construction about 100 meters over the school to prevent flooding on that side of the hill and for irrigation purpose.
In the two central pictures, Mr. Shiva Lamicchane (above) (Langtang Foundation Society Uttergaya) and Mr. Dhurba Acharya (School Construction Committee President, below) stay near the channel. Still locals do not know when they will finish it.
Meanwhile, due to a fund from the District Government, locals started to build a new edifice (bottom) which will give two additional classrooms.